PROJECT INQUIRY
Send Your Washroom Layout for Quotation
Project drawings, preliminary dimensions and early-stage inquiries are welcome.
KEY FACTS
What information is needed for a toilet partition quotation?
A useful quotation starts with the project location, facility type, layout or opening dimensions, product direction and approximate quantity. Color, hardware and delivery details can be confirmed during review if they are not available yet.
Open the complete project checklist- Layout drawing, sketch or opening sizes
- Cubicle, screen or locker quantity
- Preferred product and material direction
- Color or finish direction
- Hardware preference, if known
- Destination and required delivery time
WHAT HAPPENS NEXT
From preliminary information to a confirmed quotation.
The review sequence keeps unconfirmed dimensions, finishes and hardware choices visible before production information is finalized.
We identify missing project information
We recommend the suitable panel and hardware direction
We prepare a project quotation
We confirm drawings, finishes and delivery details
INQUIRY FAQ
Start before every detail is finalized.
What files can I send?+
PDF, DWG, DXF, JPG, PNG and ZIP files can be attached. Each file must be 5 MB or smaller and the combined upload must not exceed 10 MB.
Can I send only a rough layout?+
Yes. A marked sketch, overall opening sizes or an early architectural plan can start the review.
Do you quote custom sizes?+
Yes. Final panel, door, screen or locker dimensions are coordinated from the reviewed project information.

