MEASUREMENT GUIDE

How to Measure Toilet Partitions

Measure layout, width, depth, height, door direction and site conditions for quotation.

KEY FACTS

Quick answer

Measure the overall washroom layout first, then record each cubicle width, divider depth, finished height, door opening direction and fixed wall positions. Note floor, wall and ceiling conditions because they affect mounting. A plan or marked-up sketch with dimensions is preferable to a list of numbers without location references.

  • Measure from finished surfaces
  • Show every dimension on a plan or sketch
  • Mark inward and outward door swings
  • Photograph wall, floor and ceiling interfaces
  • Record accessible cubicle requirements separately
01

1. Overall layout

Record room width, depth, fixed walls, columns and sanitary fixture positions.

  • Use finished dimensions
  • Identify datum points
  • Mark obstructions
02

2. Cubicle dimensions

Show each door opening, pilaster line and divider depth.

  • Overall front line
  • Individual cubicle widths
  • Door direction and clearance
03

3. Site conditions

Mounting depends on the actual supporting surfaces.

  • Wall and floor construction
  • Ceiling or headrail condition
  • Finished floor level

START A PROJECT

Apply this guide to your project.

Include the layout drawing, opening size, quantity, panel color, hardware preference, and project country. Early-stage information is welcome.

Send Your Project Information
WhatsApp
Request a QuoteWhatsApp